| Overview |
| |
| Imagine
having crews working a mile away from each other and still
being in the same building. That was the case in the 3,000,000
SQFT Nissan project. Add a fast-track schedule to a multimillion
square foot roof and you get top crews manning three buildings
at a time and averaging 30,000 SQFT of roofing per day. Install
7.5 miles of Kynar 500 coated perimeter flashing and you get
your own color.
|
| Roofing |
|
|
|
Although the original plan called for 2,000,000 SQFT of
roofing, after several expansions including the Painting Systems
2 building, 3,000,000 SQFT of Firestone Ultraply 78 PVC roofing
was installed along with 7 1/2 miles of Nissan White Kynar
500 coated perimeter flashing.
|
| Waterproofing |
| |
| All
waterproofing work was completed as part of the roofing project.
|
| Special
Considerations |
| |
| In
spite of the initial size of the project and the increase
in scope by 50% (1,000,000 SQFT), ramped up crews were able
to keep up with a sequence of construction by completing an
average of 30,000 SQFT of roofing per day and finish on schedule.
|
|
|
| |
|
|
| |
|
|
| |
1
1/4 miles long
|
|
| |
|
|
| |
|
|
| |
3,000,000
SQFT roofing
|
|
| |
|
|
| |
|
|
| |
40,000
SQFT roofing per day
|
|
| |
|
|
| |
|
|
| |
7
1/2 miles of "Nissan White" Kynar perimeter flashing
|
|
| |
|
|
|